Courthouse will closed all day Friday, April 24, 2026 in observance of Arbor Day.


X
Field in Madison County Nebraska

Surveyor

For your convenience, we have posted the section corner Tie Sheets online. Feel free to also browse the other pages in our section of this web site and contact our office if you have any questions.

State of Nebraska Statutes

County surveyor; county engineer; qualifications; powers and duties.

It shall be the duty of the county surveyor to make or cause to be made all surveys within his or her county that the county surveyor may be called upon to make and record the same.

In all counties having a population of at least fifty thousand inhabitants but less than one hundred fifty thousand inhabitants, the county surveyor shall be ex officio county engineer and shall be either a professional engineer as provided in the Engineers and Architects Regulation Act or a registered land surveyor as provided in sections 81-8,108 to 81-8,127 or both. In such counties, the office of surveyor shall be full time.

The county engineer or ex officio county engineer shall:

(a) Prepare all plans, specifications, and detail drawings for the use of the county in advertising and letting all contracts for the building and repair of bridges, culverts, and all public improvements upon the roads;

(b) Make estimates of the cost of all such contemplated public improvements, make estimates of all material required for such public improvements, inspect the material and have the same measured and ascertained, and report to the county board whether the same is in accordance with its requirements;

(c) Superintend the construction of all such public improvements and inspect and require that the same shall be done according to contract;

(d) Make estimates of the cost of all labor and material which shall be necessary for the construction of all bridges and improvements upon public highways, inspect all of the work and materials placed in any such public improvements, and make a report in writing to the county board with a statement in regard to whether the same comply with the plans, specifications, and detail drawings of the county board prepared for such work or improvements and under which the contract was let; and

(e) Have charge and general supervision of work or improvements authorized by the county board, inspect all materials, direct the work, and make a report of each piece of work to the county board.

The county engineer or surveyor shall also have such other and further powers as are necessarily incident to the general powers granted.

Search Icon

Helpful Links

Scroll To Top